15 kVa 3-phase hardware-in-the-loop for testing low carbon technologies under various grid operating conditions

    Facility/equipment: Facility

      Equipments Details

      Description

      15 kVa 3-phase hardware-in-the-loop for testing low-carbon technologies under various grid operating conditions. Suitable for:

      Electric vehicle chargers
      Solar inverters
      Mains batteries
      Flywheel energy storage
      Smart appliances

      Fingerprint

      Explore the research areas in which this equipment has been used. These labels are generated based on the related outputs. Together they form a unique fingerprint.