Skip to main navigation Skip to search Skip to main content

A conceptual framework for managing project delay and cost overruns in UK mega infrastructure projects (MIPs)

Research output: Types of Thesis › PhD › peer-review

21 Downloads (Pure)

Abstract

Mega infrastructure projects delays, and cost overruns are major challenges faced by every national construction industry. They are more complex in terms of managing the scope and risk in construction infrastructure projects. The resulting effects on budget and project duration can lead to difficulties in the successful completion of the project. Hence, the need for every project stakeholder to have an idea of the causative factors of delays and cost overruns and to be able to take the initiative in mitigating the risk that these can pose. The construction industry has faced these challenges globally without much success achieved from previous research undertaken to mitigate this problem. These complications have significantly affected the way the industry is viewed as low productive, low profit making, and non-collaborative with relatively poor project success rate when compared to other industries. Mega infrastructure project delays and cost overruns are complex and despite the amount of research done, these challenges persist. Hence, this study helps to explain the interactions that exist between the various causes of delays and cost overruns. The study relates to the design of a contemporary framework for managing delays and cost overruns. The comprehensive study covers both the delays and cost overruns causative factors and their management control measure. The methodology adopted is based on questionnaire survey and semi structured interview where both the quantitative and qualitative data were analysed to develop the framework and explain factors contributing to both delays and cost overruns. For the quantitative study, the data analysis methods utilised in the study were Cronbach’s alpha reliability, relative importance index, (both descriptive statistics), and Pearson’s correlation analysis (inferential statistics) For the qualitative study, the thematic analysis is employed to identify common themes and experts’ opinions from the participants. The developed framework design and the proposal were validated formally and informally with practice and academic professionals working on construction infrastructure projects. Findings from the study show that the causes of delays and cost overruns in mega infrastructure projects are multifaceted and interrelated, occurring at every stage of the project which cannot be attributed to a particular cause. The study reveals that infrastructure management complexity, poor design management, scale/scope changes, industry evolution, inadequate cost analysis, commercial and contract management challenges, risk and contingency factors, planning culture, stakeholder, and governance, external and environmental, are the main factors attributed to cost overruns. While contemporary causes of delays emanated from the study; the scale and complexity of the project made collaboration and communication difficult due to the number of stakeholders involved, the lack of an innovative planning approach, and poor risk analysis. Also, the study reveals some management measures that are necessary to accurately forecast estimated and budget costs, resources planning, disciplined change management and continuous cost and programme monitoring. These measures are crucial for mitigating delays and cost overruns. The findings from the study inform the development of keys skills and experiential competencies required for managing mega infrastructure projects. They also address gaps in the existing and contribute to knowledge by holistically examining the causative factors of delays and cost overruns, as well as their interrelationships. The resulting framework can serve as a decision-making apparatus, enabling a deeper understanding of how these interrelated causes and effect manifest at different stages of project development. Also, a framework to manage mega infrastructure delays and cost overruns was developed with constructive feedback from both practice and academic participants working in the industry who were involved in the validation and who believed the framework has the capability to help manage delays and cost overruns in construction infrastructure projects.
Original languageEnglish
Supervisors/Advisors
  • Ofori, George, Supervisor
  • Momoh, Job, Supervisor
Award date14 Sept 2026
Publisher
DOIs
Publication statusPublished - 14 Sept 2026

Cite this