An Integrated Cost-Time Approach to Risk Analysis for Construction Projects

Research output: Contribution to conferenceItempeer-review

Abstract

This paper provides a framework for modelling and quantifying risks associated with time and cost emanating from construction projects. A methodology is proposed whereby time risk analysis and estimated cost risk analysis can be related thereby producing a time related cost risk analysis. By combining this development with a comprehensive scheduling system such as POEM, project risk can be managed in a structured way throughout the project life cycle.
Original languageEnglish
Publication statusPublished - 15 Sept 1993
EventCIB W-65 Symposium 1993 -
Duration: 15 Sept 1993 → …

Conference

ConferenceCIB W-65 Symposium 1993
Period15/09/93 → …

Keywords

  • PERT
  • Risk Management
  • Risk Analysis
  • Project Management
  • Monte Carlo Simulation
  • Project Planning