Abstract
Claims are inherent in the Indian construction industry. They constitute about 10% of the total cost of Indian transportation infrastructure projects. The country plans to invest around $130 billion in new infrastructure this fiscal year to boost its economic growth. Managing change of scope (CoS) claims, one of the most prominent claims in infrastructure projects, is crucial for successful completion of these projects. This study aims to identify and prioritise factors leading to CoS claims in different infrastructure projects and propose mitigation measures specific to each critical factor to increase the project success rate in terms of achieving a zero-dispute situation. It uses Fuzzy Analytic Hierarchy Process (FAHP) to analyse the data collected from professionals within the Indian construction industry. The result reveals that unforeseen ground and site conditions predominantly cause challenges in highway projects, while inadequate data and design hinder metro projects. This study adds to the body of knowledge by providing insight into the key factors causing CoS claims in infrastructure projects. This will help practitioners to establish mitigation plans during early stages of the project.
| Original language | English |
|---|---|
| Publisher | Association of Researchers in Construction Management |
| Pages | 117-126 |
| Publication status | Published - 2 Sept 2024 |
Publication series
| Name | ARCOM Fortieth Annual Conference 2024 |
|---|---|
| Publisher | Association of Researchers in Construction Management |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 8 Decent Work and Economic Growth
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver