Abstract
This material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000165
Previous studies on building, industrial, and transportation projects found that projects delivered using design-build tend to perform better than projects delivered with the traditional design-bid-build method. However, performance of design-build projects is affected by various factors, with procurement-related factors being among the most influential.
| Original language | English |
|---|---|
| Pages (from-to) | 382-391 |
| Journal | Journal of Management in Engineering |
| DOIs | |
| Publication status | Published - Oct 2013 |
Fingerprint
Dive into the research topics of 'Study of the Relationship between Procurement Duration and Project Performance in Design-Build Projects: Comparison between Water/Wastewater and Transportation Sectors'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver