Keyphrases
Waste Heat Recovery
100%
Waste Heat Recovery System
100%
Underground Railway
100%
Cooling Potential
100%
London Underground
66%
Heat Networks
66%
Technology-based
33%
Carbon Savings
33%
Cost Savings
33%
Associated Costs
33%
Underground Network
33%
Heat Recovery
33%
Heat Pump
33%
Low Carbon
33%
Ventilation Shaft
33%
Waste-to-energy
33%
Islington
33%
London Borough
33%
Further Development
33%
Cooling Air
33%
Cooling Coil
33%
Sensible Cooling
33%
Metro System
33%
Tunnel Environment
33%
Air Inlet
33%
Cooling Duty
33%
Thermal Energy
33%
Traditional Technology
33%
Local Heat
33%
Latent Cooling
33%
Peak Temperature Reduction
33%
System Impact
33%
Heat Recovery Heat Exchanger
33%
Cooling Load
33%
Underground Tunnel
33%
Mathematical Model
33%
Inlet Parameters
33%
Engineering
Railway
100%
Waste Heat Recovery System
100%
Heat Recovery
50%
Energy Engineering
25%
Exchanger
25%
Heat Pump
25%
Metro
25%
Air Inlet
25%
Peak Temperature
25%
Conventional Technology
25%
Cooling Coil
25%
Cooling Load
25%
Mathematical Model
25%
Thermal Energy
25%